|
I got the piece geomerged (*GASP* MY FIRST GEOMERGE), but now another piece geomerged took me 3/4 of an hour to get in, but it was too deep on one end. I changed it, and now one end's too high. Is there a way you could help me? I'm trying to make this map a fair debut on ForgeHub.
Edit: The way I geomerged was adapted from the Foundry door method. I braced with walls, and then pushed. It's currently a brute method, requiring a long time, but It looks/plays OK so far.
Last edited by CookieMan; 04-21-2009 at 10:05.
Reason: Describe self-discovered way to geomerge Sandbox
|